Hawaiʻi Department of Health Wastewater Branch
State cesspool information and resources
The statewide page does not identify or certify the system serving a specific parcel.
Open official source ↗Hawaiʻi term
Listings sometimes say “septic” when the property still has a cesspool, or the reverse. The systems are different. A cesspool is a covered pit. A septic system uses a tank and a soil-treatment component. That difference changes inspection, conversion, and quote scope.
Reviewed September 3, 2026
Direct answer. Identify the actual system from records and a qualified inspection, then use Hawaiʻi Department of Health wastewater pages for current conversion and support information. Do not price the job from a statewide average.

Comparable facts
Identify the actual system from records and a qualified inspection, then use current DOH pages.
Plain language
Aerobic or other individual wastewater systems also exist. The label on a listing is not a design drawing.
Plain language
Access, rock or lava excavation, setbacks from wells or water features, bedroom/design load, and restoration can change conversion cost more than the system name. Use the conversion cost calculator as a range, then force every provider onto the same written scope.
Plain language
Hawaiʻi Department of Health Wastewater Branch publishes current cesspool information and financial-support program pages. Confirm any statewide conversion timing, priority areas, and application rules there. This site does not certify eligibility or a property’s required system.
Official starting points
Hawaiʻi Department of Health Wastewater Branch
The statewide page does not identify or certify the system serving a specific parcel.
Open official source ↗Official starting point
Confirm current rules, dates, and eligibility on the agency page. This site does not certify a property.
Open official source ↗Official starting point
Confirm current rules, dates, and eligibility on the agency page. This site does not certify a property.
Open official source ↗Common questions
No. Confirm the system type, location, condition, and records. Listing language is not a pumping report or a permit closeout.
No. Design depends on a qualified site evaluation. The calculator keeps uncertainty visible until that evaluation exists.